Wednesday 7 September 2016

A Simple Risk-Based Control plan


RISK LEVEL
                ACTION AND TIMESCALE
TRIVIAL
No action is required and no documentary records need to be kept
TOLERABLE
No additional controls are required. Consideration may be given to a more cost-effective solution or improvement that imposes no additional cost burden. Monitoring is required to ensure that the controls are maintained.
MODERATE
Efforts should be made to reduce the risk, but the costs of prevention should be carefully measured and limited. Risk reduction measures should be implemented within a defined time period. Where the moderate risk is associated with extremely harmful consequences, further assessment may be necessary to establish more precisely the likelihood of harm as a basis for determining the need for improved control measures.
SUBSTANTIAL
Work should not be started until the risk has been reduced. Considerable resources may have to be allocated to reduce the risk. Where the risk involves work in progress, urgent action should be taken.
INTOLERABLE
Work should not be started or continued until the risk has been reduced. If it is not possible to reduce risk even with unlimited resources, work has to remain prohibited.

Safety Courses in Chennai | Nebosh Courses in Chennai | OHSAS 18001 | Apply Now

Contact for Safety Courses:  +91 90258 02211 | info@poshesolutions.com

No comments:

Post a Comment